Time to Get Plastered

There was a strange hush in the saloon today as all stands in readiness for the next giant leap forward. Katie and I have swept the floors, picked up the flotsam, retrieved all the tools and sprayed copious amounts of expanding foam anywhere we could imagine cold air sneaking in.  And the reason? Drywall installation will commence at 10am May 2nd!

Katie and I have been driving ourselves mad with the last details, making sure that the ceiling insulation is done and that the HVAC contractors, electricians and plumbers have all finished their prep work for the momentous occasion. As a case in point I realized, at the last minute, that the HVAC guys had not installed wiring for the thermostats so I quickly Googled thermostat placement and made my best guess as to where the wires should go. Now that I’ve completed the fire drill, the contractors will probably install some sort of wireless setup just to spite me.

We also have other creature features that we’ve completed. Both of our offices have the latest data cable from our tiny telco room under the stairs. We’ve also run cables to two possible TV locations upstairs and there is an additional cable from the living room to the kitchen to wire up a pair of old hand crank telephones as an intercom system.

Of course, my biggest worry is about how the drywall guys will take to my framing. On the first floor, it’s all new walls so that’s not an issue but upstairs is a mix of existing walls that were built for lath and plaster and new framing which is carefully mated to the old. Blending the old and the new has been a big challenge for me because I’ve never framed walls before and I had to make up a lot of it as I went along. Thankfully, the building inspector has already seen my work and deemed it to be good enough, even the ugly bits. Besides, all my sins will soon be covered in drywall not to be seen again until after I’m gone and some new owner decides that they just can’t live with the old walls.

So, I guess it’s time to take a bit of a break as the drywall guys do their thing. Now that I’m not stuffing fiberglass insulation into ceilings anymore, the terminal itchiness will subside and my tendinitis may ease up some allowing me to refocus on flooring. Kneepads will be a must.

Author: Dusty

I'm a 5' 8" tall ape descendant with an interior design degree and a love for antiques and vintage architecture. I recently escaped from the IT world to follow my dreams and a beautiful damsel who shares my love of old buildings no matter how much dust is involved.

2 thoughts on “Time to Get Plastered”

  1. Awesomeness! The paint outside looks great too…..I guess I’ve missed a few blog posts, time to catch up!

  2. Everything is coming along beautifully. Really enjoyed the presentation Wednesday evening at the community center.

Leave a Reply

Your email address will not be published. Required fields are marked *